Hi all,
I have a issue about crystal report scheduling (not sure it coming from the platform or crystal report).
I schedule a crystal report and wait for an hour. After a few hours, the failed status appear.
Error message: Object failed to run due to an error while processing on the Job Server.
I have been tried restart the SIA server and the result remain same.
Besides that, I also try to check the data source (ODBC) and reconfigure the data location with the report, but still failed.
Here is the server that run the BI 4
VMWare Virtual Platform
OS: Windows Server 2008 R2 Enterprise 64-bit
BI Platform: BI 4 SP7
Database: Ms SQL 2008
RAM: 16 GB
Hard Disk: 250 GB
Anyone has the solution or the idea to solve this problem.
Regards,
Thank You.