Quantcast
Channel: SCN : Discussion List - BI Platform
Viewing all articles
Browse latest Browse all 5403

CR Server 2011 - Can CCM automatically reference an updated report for use in an existing recurring schedule?

$
0
0

We currently have over 50 reports loaded in our CR 2011 Server. Each report is scheduled to run 3 times per day. When scheduling the reports, we must create seperate instances for 8 branch locations each with two seperate time parameters (last week and current week).

 

When making even a minor logical adjustment to a single report, we must upload the report to the CCM, and create a whole new set of 48 report schedules. There has to be an easier way!! Can we configure CCM to reference a report directory/location and use this base report to feed the existing schedules?  This way, we could update the base report, save it in the predifined directory using the original report name and the server could just use the updated file?

 

Thanks in advance for your assistance.


Viewing all articles
Browse latest Browse all 5403

Trending Articles