Dear All,
I'm creating a query for dashboard based on a universe that takes data from SAP BW system. For some days the query has been taking very long time. When I go to Event Viewer of Server Machine on which BO server is installed I see a warning :
"A subprocess in the processing serer was forced to terminate. (RCIRAS0622)" \\ screen shot attached.
I'm using BO Edge BI 4.0 SP 4 Patch level 0, installed on a single, machine which is Windows Server 2008 R2 Enterprise SP 1 (64 bit). BO db is Oracle. Dashboard is 4.0 sp4 patch 0 installed on win xp 32 bit machine.
Can anybody please tell me what is wrong with the dashboard query?
I've gone through other posts/sap notes regarding this error, but found them to be relating to either crystal reports scheduling or webi document scheduling which is not relevant to my scenario.