Hello All,
We have a requirement to schedule a webi report based on event generated by ETL loads.
Scheduling works fine based on events.My requirement is If event is not generated we want to schedule the report at specific time.Lets assume event will generate between 10 Am to 11 Am.If event is not generated report will not schedule,but we want schedule report after 11 Am.
Please let us know if any one have solution for the above