Hi,
We are facing one weird issue with one of our crystal report. This report when scheduled to PDF shows pound sign instead of dollar. However, report's graphs is configured to show amount in dollar.
From BO admin team, we got a response that since server is physically located in London, it's taking pound sign.
I thought of one solution to change the following servers in CMC for that specific report only.
1.Document processing server
2.Report job server
Kindly suggest if it is possible to change the processes for specific report on CMC.
Thanks
Manish